Production Capacity: 400000 tons/year
Starting material: billets 150x150x6000 mm
Final product: rebar with diameter from 8 to 32 mm
This plant is located in Dubai, UAE.
It was commissioned in 2007.
AMB supplied the electrical equipment and realized the automation software.